Indoors Bill has been working away forming new hand rails around the sissons and robey engines. The robey engine has also been receiving its final coats of JCB yellow with black details. It is now by far the brightest engine in the collection.

On the extensions front, concrete blocks are being delivered later this week. Some 1500! These will stacked alongside the railway in the car park to enable us to move them on trucks to near the site. Storage space is lacking and this option is by far the most fun! In total there will be 21 packs, 4 of which will be loaded directly onto railway flat wagons. Pictures of this later on Friday. The trucks have been prepared ready for the load.